Heard the term Permit building or commonly known as IMB is surely familiar to us, especially those of you who are in the process of setting up the House or other building. However, in reality, there are still many people – and perhaps wrong satuya is us – who have yet to know and understand about how to take care of the IMB. Finally, using the services of a third party being the last option to be able to help resolve the management of IMB.So, what the heck actually IMB it?
IMB itself is actually the permissions that should be taken care of when will building, expansion, change, reduce or take care of the building. BUILDING PERMITS are usually issued by the local government. Take care of the IMB was important. Have a IMB was mandatory. Why? First, since the IMB has been regulated in the legislation. Second, by having the IMB, we so know the information will land allocation plan which we will wake up. Third, the IMB is a proof that the buildings we build it safely and in accordance with the provisions of the land assigned by the Government. Fourth, IMB became one of the preconditions for us to get public services such as electricity, water, telephone and gas also. Fifth, building air-IMB must have a higher value. In addition, without having the IMB, we are can be exposed to sanctions. Its worst risk is the demolition of the building. Sure you don't want it to happen on your building isn't it?![]() |
| Picture From Kompas.com |
If so, how do I take care of the IMB? In fact, the management of the IMB was very easy to know the correct procedure. Here we will describe the procedure of management of IMB.
1. Complete the requirements document administration
Some of the terms of the administrative documents needed when applying for BUILDING PERMITS are as follows.
Applicant data, which consists of:
- Applicant data form containing the applicant's name, address of the applicant, and the status of land rights.
- The applicant's identity document, in the form of fotocopi ID CARD or other identity and power of Attorney from the owner of the building in which to apply instead of the pemiik building.
- Proof status of ownership rights to the land or land utilization agreement
- Data condition/situation land (location/locations and topography)
- Affidavit that the land is not in dispute status
- Tax notice indebted Earth and buildings (SPPT – UNITED NATIONS) in this regard.
- Document analysis on impact and disturbance to the environment or environmental monitoring (UPL)/the efforts of environmental management (UKL) for being exposed to liability.
2. Complete the technical plan requirements document
The terms of the plan document specified technical data General is building and design drawings, ranging from images of architectural plans of buildings, structural system, system utilities, and so on. This will be adapted to the classification of your buildings, whether residential or another. For homes under 500 m2, management of the IMB can be done in district, by coming to one door Integrated Service counters (PTSP). If you do not have technical documents such as architectural drawings, the officer will come to your home to help make the drawing.
3. Wait for the evaluation
These documents will be reviewed and evaluated by the local government, in this case the bupati/walikota. Long examination and evaluation is 7-14 working days, depending on the complexity of the building.
4. Pay the levy
Next, you pay a levy on IMB according the established in the evaluation results. If it is, the payment of retribution IMB handed over to the authorities of the region.
5. Take the IMB
After all the process is executed, then the local Government will publish the application for a building Permit (IMB) and within 7 working days counted since the levy payment IMB received.
Well, how? Take care of BUILDING PERMITS are not hard right? So, if your building has yet to include the IMB, mari soon take care of BUILDING PERMITS your building.